Back to Our work ENGINEERING Data Architecture, engineering and migration Challenge Adapt legacy data infrastructure stack (Google Cloud Platform) to new global operating model (Microsoft Azure) in 8 weeks.Ensuring no disruption in BAU data consumption while migrating the full back end of the data analytics solution. Solution Normalising all data sets coming from disparate teams/sources: all to be stored within a new database.Re-defining data schemas and computed metrics structure that allowed the previous analytics solution to be migrated. Results Successful migration to new corporate infrastructure model in 6 weeks. Complete data visualisation technology switch in 8 weeks. Adapted to client operating development methodologies to complete migration in a record time for the business.